The Module Is Already Live
The Notified Bodies & Certificates module is not a 2027 launch. Commission Decision (EU) 2025/2371 confirmed four EUDAMED electronic systems as functional: actor registration, UDI and device registration, notified bodies and certificates, and market surveillance. Their use became mandatory on May 28, 2026.
MDR Article 56(5) requires the notified body to "enter in the electronic system referred to in Article 57 any information regarding certificates issued, including amendments and supplements thereto, and regarding suspended, reinstated, withdrawn or refused certificates and restrictions imposed on certificates," and states that this information "shall be accessible to the public." IVDR Article 51(5) places the same duty on notified bodies for IVD certificates. What the transitional provisions add is a deadline for getting that certificate information into the system.
What Ends on May 27, 2027
MDR Article 123(3), point (ea), says that "no later than 18 months from the date of publication of the notice referred to in Article 34(3)" for the notified bodies and certificates system, notified bodies "shall ensure that the information to be entered in Eudamed in accordance with Article 56(5) is entered in that electronic system, including regarding devices referred to in point (e)(i)". Point (e)(i) covers devices, other than custom-made devices, for which the manufacturer has undertaken a conformity assessment under the MDR, provided they are also placed on the market from the mandatory-use date.
For those devices point (ea) limits what has to go in: "only the latest relevant certificate and, where applicable, any subsequent decision taken by the notified body related to such certificate shall be entered." A notified body does not have to back-load the full certificate history of a device.
MDCG 2026-4 rev.1, "MDCG Position Paper: Management of SS(C)P in EUDAMED after mandatory use" (October 2026), describes the same period from the other side: "a 12-month transition period for notified bodies to upload the corresponding certificates in the Notified Bodies & Certificates module (ending on 27 May 2027) is foreseen." Our SSCP upload guide covers the same paper for its manufacturer-side timeline.
Why This Gap Exists
MDCG 2026-4 rev.1 connects this period to the manufacturer-side SSCP upload timeline. A footnote plans the manufacturer upload functionality for EUDAMED Production in December 2026. Because notified bodies have until May 27, 2027 to enter the corresponding certificates, the paper warns of a specific consequence: "there may be a significant number of devices registered in EUDAMED which do not have yet a corresponding certificate and related SS(C)P registered by the notified body when the functionality that allows manufacturers to manage SS(C)Ps is available in Production."
The regulation ties the SSCP to the certificate in the same way. Point (eb) of MDR Article 123(3) says the obligation to upload the SSCP under Article 32(1) applies to devices referred to in point (e) "when the certificate is entered in Eudamed in accordance with point (ea)". IVDR Article 113(3), point (fc), does the same for the SSP.
Where the Date Comes From
Points (ea) and (eb) of MDR Article 123(3) were inserted by Regulation (EU) 2024/1860. Commission Decision (EU) 2025/2371, published on November 27, 2025, is the notice that started the clock. Eighteen months from that publication gives the May 27, 2027 date that MDCG 2026-4 rev.1 states.
For IVD certificates, IVDR Article 113(3), point (fb), sets the same duty for information entered under IVDR Article 51(5) but counts differently. It runs "no later than 12 months from the date set out in point (f)", the mandatory-use date of May 28, 2026, and also ends in late May 2027. Like point (ea), it limits entry for the devices referred to in point (fa)(i) to the latest relevant certificate and any later decision on it.
MDCG 2026-4 rev.1 itself is not the legal source. Its cover page states that "The document is not a European Commission document and it cannot be regarded as reflecting the official position of the European Commission" and that "Any views expressed in this document are not legally binding". The binding deadline is the one in the regulations.
Three Dates, Three Different Obligations
Manufacturers tracking this transition are tracking three separate items, each with its own source and its own owner.
| Date | What It Is | Who Acts | Source |
|---|---|---|---|
| November 27, 2026 | Deadline to enter EUDAMED registration data for devices on the market before May 28, 2026 that are still being placed on it | Manufacturer | MDR Article 123(3)(e) / IVDR Article 113(3)(fa) |
| March 27, 2027 | Date by which MDCG 2026-4 rev.1 says manufacturers should upload the SSCP or SSP of devices placed on the market before mandatory use | Manufacturer | MDCG 2026-4 rev.1 (non-binding) |
| May 27, 2027 | Deadline for notified bodies to enter certificate information, including the latest certificate of MDR-certified devices referred to in point (e)(i) | Notified body | MDR Article 123(3) point (ea) / IVDR Article 113(3) point (fb) |
A device can clear the first line and still be waiting on the second and third. Our November 2026 deadline guide covers the registration obligation in full; our SSCP upload guide covers the manufacturer-side March date and the Playground-to-Production rollout.
What Notified Bodies and Manufacturers Should Do
- Do not wait for a 2027 module launch. The Notified Bodies & Certificates module has been mandatory since May 28, 2026. The open item is the notified body's deadline to enter certificate information in it.
- Ask the notified body directly whether a given device's certificate has already been entered in EUDAMED. A completed device registration does not tell you that.
- Treat May 27, 2027 as a legal deadline for the notified body under MDR Article 123(3)(ea). For a device referred to in point (e), the SSCP upload obligation under point (eb) applies when its certificate is entered.
- Keep the registration deadline, the SSCP upload date and the certificate deadline on three separate lines in the project plan.
Common Misconceptions
| Misconception | What the Sources Say |
|---|---|
| The Notified Bodies & Certificates module goes live in May 2027 | It has been mandatory since May 28, 2026, alongside Actor registration and UDI/Devices |
| May 27, 2027 is only an MDCG planning date | MDR Article 123(3), point (ea), sets it as 18 months from publication of the EUDAMED notice; MDCG 2026-4 rev.1 repeats it |
| Notified bodies must back-load every certificate a device ever had | For devices referred to in point (e)(i), point (ea) requires only the latest relevant certificate and any later decision on it |
| A device registered in EUDAMED by November 27, 2026 automatically has its certificate and SSCP on file | MDCG 2026-4 rev.1 expects a gap here during the transition, by its own description |
Primary Sources
| Document | Covers |
|---|---|
| MDCG 2026-4 rev.1, "MDCG Position Paper: Management of SS(C)P in EUDAMED after mandatory use" (October 2026) | The 12-month transition period for notified bodies to upload certificates, the May 27, 2027 end date, the March 27, 2027 SSCP upload date, and the expected registration versus certificate gap |
| Regulation (EU) 2017/745 (MDR), Articles 56(5) and 123(3) | Article 56(5): the notified body's duty to enter certificate information in EUDAMED. Article 123(3), points (ea) and (eb): the 18-month entry deadline and the link to SSCP upload |
| Regulation (EU) 2017/746 (IVDR), Articles 51(5) and 113(3) | Article 51(5) and Article 113(3), points (fb) and (fc): the same duty for IVD certificates, with a deadline counted from the point (f) date |
| Commission Decision (EU) 2025/2371 | The four EUDAMED systems confirmed functional; published November 27, 2025, which starts the transitional periods |
The Notified Bodies & Certificates module is not waiting for 2027. The open item is the notified body's legal deadline to enter certificate information in EUDAMED. Track it as its own line next to November 27, 2026 and March 27, 2027.
Frequently Asked Questions
Is the EUDAMED Notified Bodies & Certificates module new in May 2027?
No. The Notified Bodies & Certificates module is one of the four EUDAMED modules that became mandatory on May 28, 2026, alongside Actor registration and UDI/Devices. Notified bodies have been entering certificate information into it since that date, under MDR Article 56(5) and IVDR Article 51(5). May 27, 2027 is not a launch date. It is the end of the period MDR Article 123(3), point (ea), gives notified bodies to get that certificate information into EUDAMED.
What exactly ends on May 27, 2027?
MDR Article 123(3), point (ea), says that no later than 18 months from publication of the EUDAMED notice, notified bodies shall ensure that the information required by Article 56(5) is entered in the Notified Bodies & Certificates module. The notice, Commission Decision (EU) 2025/2371, was published on November 27, 2025. Point (ea) names the devices referred to in point (e)(i), those with an MDR conformity assessment that are also placed on the market from the mandatory-use date, and for those devices only the latest relevant certificate and any later decision on it must be entered. MDCG 2026-4 rev.1 calls this a 12-month transition period ending on 27 May 2027.
Is May 27, 2027 a legally binding deadline?
Yes. The date comes from the regulations themselves. MDR Article 123(3), point (ea), and IVDR Article 113(3), point (fb), were both inserted by Regulation (EU) 2024/1860, and they set the period within which notified bodies must enter certificate information in EUDAMED. MDCG 2026-4 rev.1 is a non-binding position paper that repeats the date. It is not the source of it.
How is this different from the March 27, 2027 SSCP upload date?
Entering the certificate is the notified body's task. Under MDCG 2026-4 rev.1 the manufacturer uploads the Summary of Safety and Clinical Performance (SSCP) or Summary of Safety and Performance (SSP) once that functionality is live in Production, and the notified body indicates the validated version when registering or linking the certificate. MDCG 2026-4 rev.1 says manufacturers should upload the SSCP or SSP no later than March 27, 2027. May 27, 2027 is the end of the period MDR Article 123(3)(ea) gives notified bodies to enter the certificate. Our SSCP upload guide covers the March date and the manufacturer-side workflow in full.
Can a device be registered in EUDAMED without having its certificate entered yet?
Yes. MDCG 2026-4 rev.1 says that because of the 12-month transition period there may be a significant number of devices registered in EUDAMED that do not yet have a corresponding certificate and related SS(C)P registered by the notified body when manufacturer SSCP upload becomes available. The device registration deadline (November 27, 2026) falls months before the certificate deadline (May 27, 2027).